Planning a Spring Kitchen Remodel? Start in January

Custom cabinetry alone can take 6-12 weeks before it ever reaches your house. Here is why the best time to start designing a spring kitchen is the dead of winter.

Planning a Spring Kitchen Remodel? Start in January

Design and permitting take longer than the build

A full kitchen remodel usually spends more calendar time in design, material selection and permitting than it does in the actual demo-to-finish construction window. By the time crews show up to start demo, most of the schedule has already happened on paper.

Lead times are the real schedule driver

  • Custom and semi-custom cabinetry is usually the longest lead time in the whole project, often 6-12 weeks depending on the shop, the finish and the time of year.
  • Countertop fabrication and install typically can't start until cabinets are in, which adds its own few weeks on top.
  • Specialty or imported tile can be back-ordered with little warning, so a late tile decision is one of the easiest ways to push a start date.

Showroom visits take longer than they look

Narrowing a full kitchen's finishes — cabinets, counters, tile, hardware, lighting, flooring — rarely happens in one visit. Plan on at least two or three trips to the showroom before everything is locked in.

Connecticut winters are a good excuse to plan, not a reason to wait

Once a design is finalized, permit review and approval adds its own timeline before demo can start, and that clock doesn't start until drawings are ready. Starting the conversation in January, while the weather keeps everyone indoors anyway, gives the whole process room to breathe.

If you want cabinets installed by spring, the finish selections need to be locked in well before then — starting in January is what makes that timeline realistic instead of rushed.