Design Scope
Curbless walk-in shower
Bathrooms · Windsor

Curbless walk-in shower

TownWindsor
ScopeAccessible bath
Timeline2 weeks
Investment$16k–$20k
The briefA tub that was getting harder to step into.
What we didCurbless shower with a linear drain, marble-look slabs, a teak bench and a handheld shower.
The resultSafe, easy and beautiful, built to age in place.

Project timeline

Week 1Consultation and measure
Week 23D design approved, quote signed
Weeks 3–4Permits and materials ordered
Build2 weeks on site
HandoverWalkthrough and warranty
Products used
Kalia fixturesFleurco glassSchluter Systems
See them in the showroom →
★★★★★“Exactly what we needed to stay in our home.”J. Patel · sample review
▶
Video testimonial · J. Patel60-second video · file needed
Start a project like thisFree consultation and a written quote within 24 hours.
Book free consultation
Next projectStorm roof make-safe and repair →
Book free consultationCall